Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of existing concrete including concrete pavement, cross-pan, sidewalk, curb and gutter, curb ramps.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Removal and replacement of existing concrete including concrete pavement, cross-pan, sidewalk, curb and gutter, curb ramps.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform construction of curbs, curb ramps and walks at various locations.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Perform construction of curbs, curb ramps and walks at various locations.
AvailableWork will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
AvailableWork will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →