Annual Construction Contract For Utility Replacement 2027
Posted
Sep 9, 2026
Oct 7, 2026
Work includes 200 LF 4" c-900 water main; 2,000 LF 6" c-900 water main; 2,000 LF 8" c-900 water main; 500 LF 20" c-905 pvc water main; ; 200 LF 4" di main; 10 EA 8" x 6" ts & v; 25 EA 6" gate valve; 5 EA 4" insertion valve (gate); 10 EA 4" ductile iron fittings; ; 25 EA fire hydrant assembly; 25 EA service saddle; 50 EA 3/4" corporation stop; 500 LF 3/4" type k copper (public); 50 EA 3/4" meter stop; 300 LF 3/4" type k copper (private); 25 EA meter box relocation; 25 EA fire hydrant assembly removal; 1,000 LF cleaning & pre-tv main, 8" sewer; 1,000 LF cleaning & pre-tv main, 10" sewer. See attached file.
