San Francisco Public Utilities Commission
Special DistrictCA
Posted
Sep 10, 2026
Oct 8, 2026
WD-2877 As-Needed Ductile Iron Water Main Replacement at Various Locations No. 3
This construction solicitation seeks a contractor for as-needed replacement of low-pressure potable-water and high-pressure emergency-fire-water ductile-iron mains, leak/break repairs, and new-development support at locations throughout San Francisco, including Yerba Buena and Treasure Islands. The estimated workload is approximately 5,000 linear feet of replacement annually for three years, with an estimated cost of $27,545,000 and a 20% LBE subcontracting requirement. Bids are due October 8, 2026 at 2:00 PM; a remote pre-bid and contractor networking conference is scheduled for September 22, 2026, and bidders need a Class A California contractor license and safety prequalification.