Open RFP

Ductile Iron Pipe Replacement Northeast Creek Water System Phases 1-5

Description: Work includes 12" c-900 PVC water main replacement 6,550 LF, 12" gate valve, valve box replacement 10 EA, fire hydrant replacement 20 EA, 3/4" water service connection 20 EA, 1" water service connection 25 EA, 1 1/2" water service connection 25 EA, 2-inch water service connection 10 EA, 3" water service connection 5 EA, 4" water service connection 5 EA, 6" water service connection 5 EA, air release valve assembly 20 EA, 12" c-900 PVC water main replacement 8,840 LF, 12" gate valve, valve box replacement 10 EA, fire hydrant replacement 20 EA, 3/4" water service connection 20 EA, 1" water service connection 25 EA, 1 1/2" water service connection 25 EA, 2" water service connection 10 EA, 3" water service connection 5 EA. See attached file.

Buyer
Louisa County Water Authority

SpecialDistrict · VA, US

Released
Aug 28, 2026
Closes
Sep 29, 2026(23 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts