Ductile Iron Pipe Replacement Northeast Creek Water System Phases 1-5
Posted
Aug 28, 2026
Sep 29, 2026
Work includes 12" c-900 PVC water main replacement 6,550 LF, 12" gate valve, valve box replacement 10 EA, fire hydrant replacement 20 EA, 3/4" water service connection 20 EA, 1" water service connection 25 EA, 1 1/2" water service connection 25 EA, 2-inch water service connection 10 EA, 3" water service connection 5 EA, 4" water service connection 5 EA, 6" water service connection 5 EA, air release valve assembly 20 EA, 12" c-900 PVC water main replacement 8,840 LF, 12" gate valve, valve box replacement 10 EA, fire hydrant replacement 20 EA, 3/4" water service connection 20 EA, 1" water service connection 25 EA, 1 1/2" water service connection 25 EA, 2" water service connection 10 EA, 3" water service connection 5 EA. See attached file.