City of Spearfish
This project consists of approx. 1,800 LF of water main installation, water service connections, connection to existing water main, abandonment of water main, approx. 1,340’ of sewer main, new manholes, manhole removal, connection to existing manholes, sanitary sewer service lines, abandonment of sewer main, installation of storm sewer, specialty storm sewer structures, asphalt removal and AC pavement, concrete pan & gutter removal, concrete sidewalk removal, new concrete work, and rehabilitation of landscaping. Contractor shall follow project sequencing and take notice of special traffic control conditions and project phasing completion dates for the project.
City of Greeley
Work includes approx 1 LS clearing and grubbing; 299 CY unclassifed excavation; 264 ;F pf silt fence; 65 LF of bridge rail type 10m. See outside link.
Austin, City Of, Transportation and Public Works Department Project Delivery Division
The work consists of intersection safety improvements including construction of sidewalks, bike lanes, raised medians, curb and gutter, pavement widening, turn lane improvements, driveway reconstruction, bus stop improvements, pavement mill and overlay, traffic signal improvements, pavement markings, signage, drainage improvements, and utility adjustments. Also includes 20 LF of encasement pipe 16" dia., type steel, min. 3/8" thickness, ASTM A134; 1,645 LF of installing PVC traffic signal conduit with conduit 2" in dia., see attached files.
Clark County
Replace existing concrete panels, seal concrete cracks and joints, construct pedestrian curb ramps, upgrade pedestrian push buttons, restripe pavement, construction surveying, flaggers, replace cement concrete panel, seal existing CCP joint, cement concrete curb ramp, monolithic cement concrete curb and sidewalk, traffic signal system PPB, permanent signing, and striping.
City of Douglas
Replacing the aging water main. 950 LF of 8" C900 DR18 PVC water pipe along with the associated fittings, valves, fire hydrants, and water services. In addition to the water main replacement, will be fully reconstructed including new sidewalks, curb and gutter, driveway approaches, alley aprons, valley gutters, and new asphalt.
Release
Dec 17, 2024
Close
Jan 22, 2025