CityMA
Posted
Oct 22, 2026
Nov 19, 2026
262397 - Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson RFP
Pavement milling and overlay, removing and stacking or resetting of existing granite curb, installation of new granite curb, construction of sidewalks and curb ramps, drainage improvements, construction of driveway aprons, loaming and seeding, installation of signs and pavement markings, safety signing. The work also consists of installing traffic control signal materials including video detection, signal posts, signal heads, mast arm assemblies, cabinet pull boxes and conduit. The work under this contract includes performing borings, designing and installing foundations, wire and cable, and electrical service connections, and all other equipment, materials and incidental costs necessary to furnish, install and program a complete and functioning traffic control signal system.
