CityCA
Posted
Sep 15, 2026
Oct 21, 2026
Site 144 Trash Capture Project
Construction of certified full trash capture systems within the designated watershed at Site 144 at the I-80 North Ditch approx 170 FT east of the intersection to prevent discharge of trash greater than 5mm into receiving waters; installation of a Water Board certified, manufacturer-prefabricated trash capture system located offline from the I-80 North Ditch; mechanically operated weir system in the drainage channel; concrete structures installation; asphalt concrete paving; earthwork; associated improvements
