South Florida Water Management District
Special DistrictFL
Posted
Sep 14, 2026
Oct 28, 2026
Cepp Eaa Phase - Eaa A-2 Reservoir S-636 Seepage Pump Station
Work inlcudes constructing four (4) pump bays, each with 60 cfs electric motor driven vertical axial flow pumps, gravity bypass culvert with a 5.5 x 5.5 slide gate, pump station structure including electrical, emergency generator and it systems for local and remote operations, stilling wells with scada monitoring, trash rack and collection system, canal modifications including realignment, backfill and excavation, associated canal and levee tie ins, boat ramps, fpl power distribution, riprap revetment and stormwater management system.
