Community Park Pond Restoration Project RFP
Work includes : 30 LF convert to veg riprap; 500 CY sediment forebay; 175 LF streambed native seed; 756 EA shoreline plugs; see attached file.
Description: Regional pond recreation area seeding project.
SpecialDistrict · ND, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Fargo Park District.
Adjacent opportunities open for bidding right now.
Posted
Sep 17, 2026
Oct 14, 2026
Work includes : 30 LF convert to veg riprap; 500 CY sediment forebay; 175 LF streambed native seed; 756 EA shoreline plugs; see attached file.
CityNC
Posted
Sep 23, 2026
Nov 5, 2026
Procurement of dam reconstruction services for the Camp Pond Dam, including spillway removal and installation, weir replacement, headwall construction, and riprap placement.
Posted
Sep 17, 2026
Oct 14, 2026
Work includes : 30 LF convert to veg riprap; 500 CY sediment forebay; 175 LF streambed native seed; 756 EA shoreline plugs; see attached file.
CityMD
Posted
Sep 24, 2026
Oct 19, 2026
Work includes installation of approx 4,229 LF of 10" HDPE DR 11 force main, along with any valves and fittings, two (2) ARV vaults and one (1) blow-off vault. The method of installation for approx 1,849 LF of the force main, from Station 23+80.57 to station 42+29.1, will be required to be directional drilling. The installation of the force main will also require connecting the force main to an existing 8" force main at station 0+00 and to an existing manhole.