Southwest Quadrant Regional Force Main McCrone Project C1200005 RFP
Posted
Sep 24, 2026
Oct 19, 2026
Work includes installation of approx 4,229 LF of 10" HDPE DR 11 force main, along with any valves and fittings, two (2) ARV vaults and one (1) blow-off vault. The method of installation for approx 1,849 LF of the force main, from Station 23+80.57 to station 42+29.1, will be required to be directional drilling. The installation of the force main will also require connecting the force main to an existing 8" force main at station 0+00 and to an existing manhole.

