CityNC
Posted
Jun 4, 2026
Nov 5, 2026
Camp Pond Dam Reconstruction Project
Work includes grouting and abandoning the upstream 14' of the existing 36" dia primary spillway reinforced concrete pipe (rcp) outlet pipe leaving the existing riser structure, installing cure-in place by ultraviolet-light lining in the remaining rcp primary spillway outlet pipe to convey drainage from richland drive catch basins, constructing a concrete headwall downstream of the catch basins, reconstructing the spillway weir upstream of the four 60" dia spillway outlet pipe, removal of approx 57 trees 6" or greater in dia at the dam crest, upstream slope, and downstream slope. See attached file.
