Posted
Sep 17, 2026
Oct 14, 2026
Community Park Pond Restoration Project RFP
Work includes : 30 LF convert to veg riprap; 500 CY sediment forebay; 175 LF streambed native seed; 756 EA shoreline plugs; see attached file.
Description: Work includes : 30 LF convert to veg riprap; 500 CY sediment forebay; 175 LF streambed native seed; 756 EA shoreline plugs; see attached file.
City · IL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Sep 17, 2026
Oct 14, 2026
Work includes : 30 LF convert to veg riprap; 500 CY sediment forebay; 175 LF streambed native seed; 756 EA shoreline plugs; see attached file.
CitySC
Posted
Sep 21, 2026
Oct 13, 2026
Demolition removal of all 2 layers, 1,360 SF of flooring down to the concrete floor, installing a concrete coating to replace the floor, sealing roof leak, and replacement of front door, door jam, storm door and lock system.
CityTX
Posted
Sep 21, 2026
Oct 28, 2026
Work includes removing accumulated silt and sediment through hydraulic dredging and dewatering operations.
State AgencyMT
Posted
Aug 26, 2026
Oct 5, 2026
The project involves riparian livestock fencing, a stockwater system, new irrigation diversion, fish screen, streambank enhancements, and stream channel realignment.
Decision makers connected to this RFP from Village of Hoffman Estates.