Central Resort District Drainage Improvements Phase 1 Design Build Project (Request For Proposal)
Design-Build: work includes central resort district drainage improvements.
Description: DESIGN-BUILD: Design and construction of a new biosolids storage facility, including installation of a reinforced concrete pad integrated with existing site surfaces, engineered pushwall structures, and an engineered metal building.
County · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Design-Build: work includes central resort district drainage improvements.
Special DistrictWI
Posted
Aug 15, 2026
Oct 1, 2026
Design and construction of a new approx. 60 ft x 120 ft x 18 ft commercial base building to support utility operations and equipment storage. The project will be completed as a DESIGN-BUILD project and includes engineering, preparation of State approved building plans, coordination of required State approvals, and construction of the building.
California State University Fresno
Higher EducationCA
Posted
Aug 17, 2026
Sep 24, 2026
The Trustees of California State University, Fresno are seeking a single design-build contractor for The Forge — Ag-Tech, Bio-Tech, and Engineering Innovation Center in Fresno, California. The work includes design, engineering, permitting, adaptive reuse and renovation of the existing Forestry Building, construction, commissioning, and closeout. The mandatory pre-bid conference and site visit are scheduled for September 2, 2026, and submissions are due September 24, 2026 at 2:00 PM PDT.
Maryland Transportation Authority
State AgencyMD
Posted
-
Oct 23, 2026
DESIGN-BUILD services. Work consists of install protection to the piers closest to the main navigation spans that accommodate inbound and outbound vessel traffic. The initial project scope includes the installation of structures to protect the four towers supporting the main spans of the eastbound and westbound bay bridges.