Open RFP

Southerly Solids Handling Improvements (SSHI) Project RFP

Description: Work includes improvements to the dissolved air flotation unit process. Installation of a new liquid sludge receiving station adjacent to the existing sludge storage tanks (SSTs). Replacement of piping, valves, vault demolition, and other appurtenances related to two easterly sludge force main vaults. Replacement of the existing waste heat boiler (WHB) dry ash pneumatic conveyance system with slurry system, replacement of existing scrubber drain header, and installation of new backup scrubber drain header. Cleaning of sludge, grit, and debris from four (4) of the existing SSTs. Replacement of exhaust fans in four (4) SSTs. Modifications of four (4) SST domes. Installation of air bubble mixing systems in four (4) SSTs. Replacement of existing maintenance building lift station. Structural repairs to six (6) existing gravity thickeners.

Buyer
Released
Nov 24, 2026
Closes
Dec 15, 2026(18 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts