Closing soon

Passive Treatment Rehabilitation Project

Description: Provide a passive treatment rehabilitation project involving rehabilitation of an existing acid mine drainage treatment system. Work includes excavation, grading, limestone aggregate installation, water level control structures, settling pond baffles, and erosion control measures, 1 EA of implementation of the erosion and sediment pollution control plan- rock construction entrance installation; 1,250 LF of implementation of the erosion and sediment pollution control plan - compost filter sock installation; 7.5 ACRE of clearing and grubbing; 15,000 CY of grading - general; 5,136 CY of grading - passive treatment embankments; 5.5 ACRE of planting - seed bed preparation; dewatering and clearing existing overflow system; 6,930 TON of limestone coarse aggregate - AASHTO no. 1.

Released
Sep 4, 2026
Closes
Sep 24, 2026(6 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts