CityCA
Posted
Sep 4, 2026
Oct 1, 2026
Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2
The work consists of removal, disposal and replacement of existing butterfly valves, electric actuators, associated steel piping, Victaulic couplings and appurtenances; rehabilitation of steel spools; recoating existing surface wash water piping; replacing electrical conduits, struts and junction boxes; connection of new actuators to existing SCADA; repair of cracks in filter basins by injecting polyurethane and associated tasks.