Pacific Avenue Cycle Track
Aug 19, 2026
Closes
Sep 17, 2026
Work consists of unclassified excavation; asphalt concrete (ac) pavement removal; concrete pavement removal; concrete removal (sidewalk, curbs, curb and gutter, curb ramps, driveway approaches); concrete removal (reinforced bus stop street pads); remove existing bus shelter or bench; remove existing tree; remove existing parking meter post; crushed miscellaneous base (cmb); cold milling; type ii slurry seal; asphalt rubberized hot mix (arhm) pavement; asphalt concrete (ac) pavement; base course ac pavement; full depth ac slot pavement; pcc pavement; pcc curb; pcc mountable curb; pcc bikeway separator; precast pcc curb; pcc curb and gutter.
