CityCA
Posted
Sep 3, 2026
Sep 18, 2026
Buchanan Park Storm Drain Improvements Project
Removal and installation of storm drain pipe and inlets, and landscape & irrigation restoration.
Description: The work generally consists of demolition and replacement of existing deteriorated concrete pedestrian pathways within park, including associated site improvements to restore safe and compliant pedestrian access around the pond. Work includes clearing and grubbing, selective tree removal, concrete and asphalt demolition, construction of new concrete walkways, installation of class ii riprap with geotextile fabric for bank stabilization, erosion and sediment control measures, traffic and pedestrian control, protection and reinstallation of existing park amenities, restoration of disturbed areas, and all incidental work necessary to complete the project in accordance with the plans and specifications.
City · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Sep 3, 2026
Sep 18, 2026
Removal and installation of storm drain pipe and inlets, and landscape & irrigation restoration.
CityMN
Posted
Sep 3, 2026
Sep 29, 2026
Construction of a new terrace park building.
CityGA
Posted
Aug 25, 2026
Oct 1, 2026
Work includes 1 LS demolition and haul off for the entire project limits and plans -including but not limited headwall/ocs systems, drainage structures, fencing, existing trees, and riprap; 1 LS earthwork and grading- includes all excavation, fill, grading, site preparation, temporary dewatering, pumping, and dewatering filtration necessary to maintain suitable and stable working conditions throughout construction. Engineer estimate approx 680 CY of excavation (raw), 2,300 CY of fill material (raw), and 2,000 CY of hauling; 1 EA chain link gate - 10' wide. See attached file.
CityNV
Posted
May 28, 2026
Sep 17, 2026
Work consists of demolition and disposal of the existing bridge structure and supports, including existing abutments, foundations, and footings, and the installation of two new concrete abutment structures, footings, and wingwalls, the placement and installation of a pre-fabricated pedestrian bridge. Additional improvements to the landing and pathway areas including asphalt pavement replacement, concrete curb replacement, bollards, and handrails. Channel restoration work includes riprap placement.
Decision makers connected to this RFP from City of Pittsburg.