Closing soon

Paradise Park Pedestrian Bridge Replacement Project

Description: Work consists of demolition and disposal of the existing bridge structure and supports, including existing abutments, foundations, and footings, and the installation of two new concrete abutment structures, footings, and wingwalls, the placement and installation of a pre-fabricated pedestrian bridge. Additional improvements to the landing and pathway areas including asphalt pavement replacement, concrete curb replacement, bollards, and handrails. Channel restoration work includes riprap placement.

Buyer
City of Reno

City · NV, US

Released
May 28, 2026
Closes
Aug 13, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts