City of Pittsburg - Cheid Drive Traffic Calming Project Phase II
Aug 6, 2026
Closes
Aug 26, 2026
Work includes approx 3,168 SF of 4” AC/8” CL II AB sawcut and remove existing AC pavement; 381 SF of concrete sidewalk; 102 LF of 8" median curb (M1-8 Curb); 62 LF of rolled curb and gutter; 266 LF of 3" roundabout mountable gutter; 434 LF of 8" vertical curb (M3-8); 238 LF of thermoplastic traffic stripe detail 22; 361 LF of thermoplastic traffic stripe detail 25; 108 LF of thermoplastic traffic stripe detail 27B; 99 LF of thermoplastic traffic stripe detail 27D; 96 SF of thermoplastic pavement marking; 351 LF of paint curb red.
