Orange Water And Sewer Authority
Special DistrictNC
Posted
Aug 19, 2026
Sep 21, 2026
W. Stinson Street Sewer Replacement
Project consists of operable installation of 424 LF of 8" gravity sewer and all associated appurtenances.
Description: Installation of approx 40 LF of 30” Steel Casing Pipe Jack or Bore; 2,041 LF of 18” PVC Sanitary Sewer Pipe, 175 LF of 18” PVC Sanitary Sewer Pipe with Class E Backfill, (6) 48” Eccentric Sanitary Sewer Manholes, (4) 60” Eccentric Sanitary Sewer Manholes, (1) 48” Flattop Storm Drain Manhole, (10) 6” Sanitary Sewer Laterals, Removal of 6 Existing Sanitary Sewer Manholes. Also Included with the Project will be Asphalt Pavement and Patching, Sidewalk, Ramp, Curb, Gutter, and Apron.
City · OR, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Orange Water And Sewer Authority
Special DistrictNC
Posted
Aug 19, 2026
Sep 21, 2026
Project consists of operable installation of 424 LF of 8" gravity sewer and all associated appurtenances.
CityNC
Posted
-
Sep 18, 2026
Work includes to remove a variable size and shape stormwater culvert at and around and replace with 36" circular reinforced concrete pipes.
Posted
Aug 10, 2026
Sep 9, 2026
Work consists of paving, sewer and drainage, traffic control, and all related work.
Posted
Aug 10, 2026
Sep 9, 2026
Work consists of paving, sewer and drainage, traffic control, and all related work.
Decision makers connected to this RFP from City of Grants Pass.