CityOR
Posted
Aug 13, 2026
Sep 24, 2026
Mill Street Sewer Replacement
Installation of approx 40 LF of 30” Steel Casing Pipe Jack or Bore; 2,041 LF of 18” PVC Sanitary Sewer Pipe, 175 LF of 18” PVC Sanitary Sewer Pipe with Class E Backfill, (6) 48” Eccentric Sanitary Sewer Manholes, (4) 60” Eccentric Sanitary Sewer Manholes, (1) 48” Flattop Storm Drain Manhole, (10) 6” Sanitary Sewer Laterals, Removal of 6 Existing Sanitary Sewer Manholes. Also Included with the Project will be Asphalt Pavement and Patching, Sidewalk, Ramp, Curb, Gutter, and Apron.