Jul 4, 2026
Closes
Aug 11, 2026
2026 Stormwater Pond Improvements
Retrofitting up to a maximum of 6 existing stormwater basins within North Huntingdon Township dependent upon the submitted bids vs. the available funds in the Townships budget for this years stormwater projects. The general scope at each basin will include the installation of E&S controls, removal of sediment and debris from within the basins to an approved and permitted site of the contractors choosing, clearing of existing trees and brush within the basin to provide a mowable surface for future maintenance, improvements to outlets structures, and restoration and seeding of impacted areas