Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Smith Lasalle
Proposed work is officially known as “Crown Road Stormwater Improvements Project” and further described as the construction of storm sewer (including horizontal directionally drilled storm sewer), pavement patching, portland cement concrete sidewalk removal and replacement, combination concrete curb and gutter removal and replacement, flap gate removal and replacement, structural repair of concrete, and landscape restoration all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL).
Posted Date
Jul 17, 2026
Due Date
Aug 11, 2026
Release: Jul 17, 2026
Smith Lasalle
Close: Aug 11, 2026
Proposed work is officially known as “Crown Road Stormwater Improvements Project” and further described as the construction of storm sewer (including horizontal directionally drilled storm sewer), pavement patching, portland cement concrete sidewalk removal and replacement, combination concrete curb and gutter removal and replacement, flap gate removal and replacement, structural repair of concrete, and landscape restoration all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL).
AvailableSmith Lasalle
Installation of 3,200 LF of roadway improvements which includes 3,900 SY of asphalt roadway paving, 6,200 SY of concrete roadway paving, 5,250 LF of concrete curb & gutter, 2,080 SY concrete and asphalt drive aprons, and 4,600 SF of concrete sidewalk, 80 LF of 4” dia. ductile iron watermain service, 150 LF of storm and combined sewer improvements, and 11 storm structures.
Posted Date
Mar 5, 2025
Due Date
Mar 26, 2025
Release: Mar 5, 2025
Smith Lasalle
Close: Mar 26, 2025
Installation of 3,200 LF of roadway improvements which includes 3,900 SY of asphalt roadway paving, 6,200 SY of concrete roadway paving, 5,250 LF of concrete curb & gutter, 2,080 SY concrete and asphalt drive aprons, and 4,600 SF of concrete sidewalk, 80 LF of 4” dia. ductile iron watermain service, 150 LF of storm and combined sewer improvements, and 11 storm structures.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge