Pond B Stormwater Detention Pond for Woodson's Reserve
Jul 29, 2026
Closes
Aug 12, 2026
Work includes approx. 7,200 cy of excavation of detention basin, including uniform shaping of excavated side slopes to lines and grades; 7,200 cy of spread and compact detention basin excavation spoils within pond b area shown in the construction plans, including onsite hauling, and uniformly spreading, shaping, grading, compacting and proof rolling spoil material; 185 LF of 18" Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints.