Description: Work approx 65 miles of gravity sewer, 15 pump stations, 24 miles of force mains, and three (3) permanent flow metering stations. The three (3) flow monitoring stations record flow that enters the ojrsa conveyance system. Project consists of: replacement of two aeration gates and two mud valves; replacement of one plant utility water pump with associated valves; replacement of digester valves (four 4"). See attached file.