CityTX
Posted
Nov 17, 2026
Dec 10, 2026
Fire Training Tower Site Work and Concrete RFP
Work includes fire training tower site work and concrete.
Description: Training tower restoration work includes install one set of code compliant metal stairs with railing to the top floor; install three metal, code compliant, railings on platforms in place of the wooden railings; install six metal removable windows; seven metal brakes around windows and top tower door; replace metal door at the top of the tower.
City · KY, US
Adjacent opportunities open for bidding right now.
CityTX
Posted
Nov 17, 2026
Dec 10, 2026
Work includes fire training tower site work and concrete.
CityMT
Posted
Nov 1, 2026
Nov 18, 2026
Installing one foundation intended to support a future training tower.
CityCA
Posted
Mar 17, 2025
Dec 1, 2026
The work consists of, but is not limited to, repairing existing wood framed 2.5 story fire training tower. This includes replacement of structural framing where damaged, new exterior openings, new roofing and interior and exterior finishes.
CityCA
Posted
Oct 22, 2026
Dec 1, 2026
In general, the work consists of, but is not limited to, repairing existing wood framed 2.5 story fire training tower at fire station 13. This includes replacement of structural framing where damaged, new exterior openings, new roofing and interior and exterior finishes.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Henderson.