CityKY
Posted
Nov 6, 2026
Nov 23, 2026
Fire Dept -Training Tower Restoration RFP
Training tower restoration work includes install one set of code compliant metal stairs with railing to the top floor; install three metal, code compliant, railings on platforms in place of the wooden railings; install six metal removable windows; seven metal brakes around windows and top tower door; replace metal door at the top of the tower.
