2026 Sanitary Sewer System Spot Repairs (33C1750)
Aug 13, 2026
Closes
Sep 15, 2026
Work will also consist of rehabilitation of sanitary sewer pipe via open trench method includes locating and raising two existing sanitary sewer manhole frame and covers that were paved over in a previous pavement rehabilitation project, the removal and replacement of two sanitary sewer manholes as well as the removal of one lamphole and construction of one sanitary sewer cleanout. The work shall include, but not be limited to, the demolition and removal of existing pavement, driveways and sidewalks; relocation of existing utilities/sewer laterals; striping restoration, and construction of new pavement, sidewalk and driveway conforms.
