Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes clearing & grubbing, scaling and excavation, installation of soil nails, mesh and hydroseeding to stabilize the hillside. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes slope stabilization.
Posted Date
Dec 31, 2025
Due Date
Feb 10, 2026
Release: Dec 31, 2025
Close: Feb 10, 2026
Work includes slope stabilization.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of labor, equipment, and materials for the Summit Ridge Slope Stabilization Project, including erosion controls, grubbing, slope benching, soil fill, topsoil with hydroseeding, and erosion control matting for two slopes.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Procurement of labor, equipment, and materials for the Summit Ridge Slope Stabilization Project, including erosion controls, grubbing, slope benching, soil fill, topsoil with hydroseeding, and erosion control matting for two slopes.
AvailableWork includes such work on the slope stabilization including drainage improvements, repairing and revegetating the existing slope, surface improvements, fence repair and access road improvement. Option work, such as additional rolled erosion control product turf reinforcement mat (recp trm) including hydroseeding, and access road improvement.
Posted Date
Dec 26, 2025
Due Date
Feb 17, 2026
Release: Dec 26, 2025
Close: Feb 17, 2026
Work includes such work on the slope stabilization including drainage improvements, repairing and revegetating the existing slope, surface improvements, fence repair and access road improvement. Option work, such as additional rolled erosion control product turf reinforcement mat (recp trm) including hydroseeding, and access road improvement.
AvailableProject consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.