Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of labor, equipment, and materials for the Summit Ridge Slope Stabilization Project, including erosion controls, grubbing, slope benching, soil fill, topsoil with hydroseeding, and erosion control matting for two slopes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Branson is soliciting bids for construction to perform slope stabilization improvements at Summit Ridge Estates. Work includes furnishing labor, materials, equipment, and testing necessary to construct the engineered slope design as shown in the plans. The solicitation is an active RFB with electronic bidding via DemandStar and requires a bid bond.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
The City of Branson is soliciting bids for construction to perform slope stabilization improvements at Summit Ridge Estates. Work includes furnishing labor, materials, equipment, and testing necessary to construct the engineered slope design as shown in the plans. The solicitation is an active RFB with electronic bidding via DemandStar and requires a bid bond.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work to be performed includes improvements to 2 slopes with each slope to include: erosion controls & bmp's installation, grubbing of the area where work is to occur, benching of the slope at no more then 5' vertical and horizontal distance to be sufficient to allow operation of a self propelled vibratory compactor, placement, grading and compaction of soil fill meeting plan requirements, placement of no less than 6" of topsoil with hydro seeding, tack and mulching per specifications and installation of erosion control matting per the plans. Seeding mixture to be composed of native prairie grasses and wildflowers.
Posted Date
Sep 26, 2025
Due Date
Jan 29, 2026
Release: Sep 26, 2025
Close: Jan 29, 2026
Work to be performed includes improvements to 2 slopes with each slope to include: erosion controls & bmp's installation, grubbing of the area where work is to occur, benching of the slope at no more then 5' vertical and horizontal distance to be sufficient to allow operation of a self propelled vibratory compactor, placement, grading and compaction of soil fill meeting plan requirements, placement of no less than 6" of topsoil with hydro seeding, tack and mulching per specifications and installation of erosion control matting per the plans. Seeding mixture to be composed of native prairie grasses and wildflowers.
AvailableWork includes slope stabilization.
Posted Date
Dec 31, 2025
Due Date
Feb 10, 2026
Release: Dec 31, 2025
Close: Feb 10, 2026
Work includes slope stabilization.
AvailableWork includes such work on the slope stabilization including drainage improvements, repairing and revegetating the existing slope, surface improvements, fence repair and access road improvement. Option work, such as additional rolled erosion control product turf reinforcement mat (recp trm) including hydroseeding, and access road improvement.
Posted Date
Dec 26, 2025
Due Date
Feb 17, 2026
Release: Dec 26, 2025
Close: Feb 17, 2026
Work includes such work on the slope stabilization including drainage improvements, repairing and revegetating the existing slope, surface improvements, fence repair and access road improvement. Option work, such as additional rolled erosion control product turf reinforcement mat (recp trm) including hydroseeding, and access road improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →