Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Ohio Turnpike and Infrastructure Commission is soliciting bids for Eastbound slope repair at Milepost 222.35 in Mahoning County, Ohio (Project No. 70-26-01). The project entails slope stabilization/repair work along the eastbound mainline of the Ohio Turnpike. Bids are due January 15, 2026 via the Bid Express portal.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
The Ohio Turnpike and Infrastructure Commission is soliciting bids for Eastbound slope repair at Milepost 222.35 in Mahoning County, Ohio (Project No. 70-26-01). The project entails slope stabilization/repair work along the eastbound mainline of the Ohio Turnpike. Bids are due January 15, 2026 via the Bid Express portal.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of drainage, slope repair, paving, traffic control, & erosion control.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Work consist of drainage, slope repair, paving, traffic control, & erosion control.
AvailableRequest for Qualifications for Phase III construction engineering services for the Highland Avenue & Lyle Avenue Roundabout Project.
Posted Date
Dec 16, 2025
Due Date
Jan 5, 2026
Release: Dec 16, 2025
Close: Jan 5, 2026
Request for Qualifications for Phase III construction engineering services for the Highland Avenue & Lyle Avenue Roundabout Project.
AvailableProject provides for the rehabilitation of Midland Avenue between West Seneca Turnpike (NY 173) and West Ostrander Avenue in the City of Syracuse. The project includes milling and paving of the roadway surface with areas of full depth reconstruction; curbing, sidewalk, driveway work; drainage system improvements; replacement of traffic signals; landscaping; and upgrades to signs and pavement markings.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
Project provides for the rehabilitation of Midland Avenue between West Seneca Turnpike (NY 173) and West Ostrander Avenue in the City of Syracuse. The project includes milling and paving of the roadway surface with areas of full depth reconstruction; curbing, sidewalk, driveway work; drainage system improvements; replacement of traffic signals; landscaping; and upgrades to signs and pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →