CityMA
Aug 6, 2026
Closes
Aug 26, 2026
Church Avenue Reconstruction Project (Phase 2)
Replace +/- 1,650' of water mains and +/- 320' of drain lines with associated manholes and catch basins. The project includes excavation, removal & disposal of existing water pipe, drain lines and catch basins and the installation of new ductile iron water lines, new gate valves, new hydrants with connections, & new drainage infrastructure.