CityWI
Posted
-
Oct 8, 2026
Capital Ave Reconstruction
Project conistss of reconstruction of street.
Description: The project consists of pavement rehabilitation operations along Peters Avenue from Orchard to Chalmers featuring the removal of 1,890 Syd of pavement ; placement of 1,433 Syd of 7" non-reinforced concrete pavement with integral curb ; placement of 402 Syd of 8" non-reinforced concrete pavement with integral curb ; placement of 1,835 Syd of 8" 21AA aggregate base ; and associated installation of edge drains, drive approaches, sidewalks, A.D.A. compliant ramps, and minor catch basin repairs.
City · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Warren.
These related opportunities are still open for bidding.
CityWI
Posted
-
Oct 8, 2026
Project conistss of reconstruction of street.
CountyNV
Posted
Aug 19, 2026
Sep 9, 2026
The work to be performed under this contract consists of excavating existing pavement material, repairing base failures as needed by replacing with type ii aggregate and re-compacting the subgrade materials, and placing new 3 or 4 asphalt concrete pavement on the top on various residential streets.
CountyNV
Posted
Aug 19, 2026
Sep 9, 2026
The work to be performed under this contract consists of excavating existing pavement material, repairing base failures as needed by replacing with type ii aggregate and re-compacting the subgrade materials, and placing new 3 or 4 asphalt concrete pavement on the top on various residential streets.
Illinois Department of Transportation
State AgencyIL
Posted
-
Sep 18, 2026
Work includes approx 15,118 CY earth excavation; 24,442 SY 12" aggregate subgrade improvement; 1,574 LF of 12' storm sewers, class a, type 2; 1,840 LF of 16' water main.