CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Progressive Design-Build Services (Request for Qualifications)
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
Description: DESIGN-BUILD services for design and construction improvements for amphi housing resource center (hrc) design build. Scope of work includes - A. Design & Construction: The structure will be: Semi-Permanent; Enclosed and Climate-controlled. The size of the semi-permanent structure is estimated to be approx. 80' x 105'. Capacity & Layout: The City is interested in two options for bed capacity: Option A: 50-75 beds; Option B: 75-100 beds; see attached file.
City · AZ, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
California State University Fresno
Higher EducationCA
Aug 17, 2026
Closes
Sep 24, 2026
The Trustees of California State University, Fresno are seeking a single design-build contractor for The Forge — Ag-Tech, Bio-Tech, and Engineering Innovation Center in Fresno, California. The work includes design, engineering, permitting, adaptive reuse and renovation of the existing Forestry Building, construction, commissioning, and closeout. The mandatory pre-bid conference and site visit are scheduled for September 2, 2026, and submissions are due September 24, 2026 at 2:00 PM PDT.
Metropolitan Washington Airports Authority
Special DistrictDC
Jun 12, 2026
Closes
Aug 19, 2026
DESIGN-BUILD Provide design-build services related to the washington dulles revitalization (wdr) package a. The scope of work covers comprehensive cradle to grave services, including planning, design, pre-construction, construction, commissioning, operational readiness, tenant relocations and closeout for multiple interconnected projects within package a, to be completed by 2034.
CityAZ
Aug 5, 2026
Closes
Sep 3, 2026
Design-bid-build seeking qualified architecture/engineering (a/e) firms for construct a new 12" reclaimed water pipeline, approx. 12,000 LF.
Procurement and program contacts connected to City of Tucson.