CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Progressive Design-Build Services (Request for Qualifications)
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
Description: DESIGN-BUILD Provide design-build services related to the washington dulles revitalization (wdr) package a. The scope of work covers comprehensive cradle to grave services, including planning, design, pre-construction, construction, commissioning, operational readiness, tenant relocations and closeout for multiple interconnected projects within package a, to be completed by 2034.
SpecialDistrict · DC, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Metropolitan Washington Airports Authority.
Adjacent opportunities open for bidding right now.
CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
CityNY
Jun 5, 2026
Closes
Aug 12, 2026
Design-build services for the construction of a new 74,000 SF resilient and sustainable recreation center. The scope of the project includes full demolition of the existing recreational center building and Golden Age Center, including cutting, capping and abandoning of all utility lines. A new facility with indoor pool and two gym/basketball courts will be designed and constructed. The new building will be located on an existing lot. The Golden Age Center will remain open and operational through the recreation center demolition and construction and will be demolished when the center is completed. See attached files and outside link.
Metropolitan Washington Airports Authority
Special DistrictDC
Jul 23, 2026
Closes
Aug 24, 2026
DESIGN-BUILD Provide design build services for the expansion to the fire protection system.
CountyVA
Jul 17, 2026
Closes
Aug 17, 2026
Request for qualifications for a Design-Builder to construct a 5,200 square foot Pre-Engineered Metal Building (PEMB) to replace the existing Singers Glen Community Center facility.