CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Progressive Design-Build Services (Request for Qualifications)
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
Description: The Trustees of California State University, Fresno are seeking a single design-build contractor for The Forge — Ag-Tech, Bio-Tech, and Engineering Innovation Center in Fresno, California. The work includes design, engineering, permitting, adaptive reuse and renovation of the existing Forestry Building, construction, commissioning, and closeout. The mandatory pre-bid conference and site visit are scheduled for September 2, 2026, and submissions are due September 24, 2026 at 2:00 PM PDT.
HigherEducation · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
CityAZ
Aug 5, 2026
Closes
Sep 3, 2026
Design-bid-build seeking qualified architecture/engineering (a/e) firms for construct a new 12" reclaimed water pipeline, approx. 12,000 LF.
CityNC
Jul 9, 2026
Closes
Sep 15, 2026
Request for Qualifications for Design-Build Services for a Fire Station, Street, and Fleet Facilities Expansion Project.
CityVA
-
Closes
Aug 21, 2026
Serve as the design-builder for the water treatment plant sedimentation basin plate settlers project. See attached files.
Procurement and program contacts connected to California State University Fresno.