SCADA Systems RFPs, Pre-RFP Signals and Bid Opportunities
See emerging pre-RFP opportunities from public-sector buyers this week based on contract renewal timing, meetings and job changes, and paired with verified contact info.
- Columbus budgeted $150,000 to replace its obsolete wastewater SCADA system, moving from 1990s-era AVEVA InTouch to Inductive Automation Ignition.
- The water utility's $82,000 project similarly transitions to Ignition with redundant servers and an alarm notification application.
- Obsolete Allen-Bradley PLCs across water and wastewater are being upgraded to 5380 series, with telemetry shifting to a licensed UHF Aprisa SR+ network.
- Fiber installation within the treatment plant will connect all operating systems to SCADA, and a wireless/fiber link will join the administration and solids buildings.
- The JRWSS Capital Investment and Facilities Plan flags SCADA PLCs and radios as 10-20 years old, outdated, and vulnerable to cybersecurity risks.
- A scheduled replacement program (Table 47-1) plans PLC and cabinet upgrades across sites from FY27 through FY40, with Modicon M580 as the standard.
- A SCADA graphics and software update project is underway, with $150,000 budgeted in each of FY27 and FY28, shared with SCWD.
- The plan recommends moving PLCs from underground vaults to above-ground stainless-steel cabinets and adding remote-read capability to flow meters via SCADA.
- Lakehaven Water and Sewer District's Board is set to approve a $2,990,821.28 contract with Carollo/TSI for SCADA migration and modernization across its water and sewer systems.
- The project spans the Sewer Pump Stations, Water System, and two Wastewater Treatment Plants, with a 24-month implementation starting January 2027.
- The District will procure hardware and infrastructure separately, with the total project cost estimated at approximately $3,250,000.
- The selected scope includes SCADA platform evaluation (AVEVA and Ignition), cybersecurity review, historian migration, and staff training.
- Township staff reported the Massie water treatment plant's SCADA system is long past its service life and was a budgeted 2026 item, prompting urgent action.
- Staff obtained quotes from two providers, with Nortech Power and Control bidding $18,500 and Ontario Clean Water Agency's IT group bidding $37,235, recommending the lower bid.
- Council awarded the SCADA replacement and upgrade contract to Nortech Power and Control for $18,500 plus taxes, with a six-to-eight-week integration timeline.
- The SCADA system is described as critical for real-time data collection and control of the plant, with a redundant RAID configuration, underscoring…
- Elgin is seeking bids for a water system improvement project that includes SCADA and control system work at three well sites and two reservoirs. The city will retain and upgrade its existing Mission SCADA system with new control panels, expanded RTU functions, and VFD pump control at Well No. 3.
- Project specifications require a paid-up one-year service contract and warranty, plus testing, startup, and operator training from the winning integrator.
- The city has pre-approved one integrator, Correct Equipment, to bid, and will accept bids from others meeting qualifications, with a 60-day bid acceptance period.
- Anacortes has budgeted $400,000 in utility rates for a WWTP SCADA reconstruction and cybersecurity upgrade, including Rockwell FTView upgrades, PLC modernization, and ISA-101 graphics, scheduled for 2030-2031.
- The plan allocates $120,000 in 2027 for Phase 7 of water SCADA/PLC reliability upgrades at the High Service Pump Station, continuing work with the same contractor, Quality Controls Corporation.
- A $250,000 project will install a stand-alone HMI for the incinerator to address the current SCADA system's lack of redundancy, scheduled for 2029 and contingent on continued incinerator operations.
- Columbus budgeted $150,000 to replace its obsolete wastewater SCADA system, moving from 1990s-era AVEVA InTouch to Inductive Automation Ignition.
- The water utility's $82,000 project similarly transitions to Ignition with redundant servers and an alarm notification application.
- Obsolete Allen-Bradley PLCs across water and wastewater are being upgraded to 5380 series, with telemetry shifting to a licensed UHF Aprisa SR+ network.
- Fiber installation within the treatment plant will connect all operating systems to SCADA, and a wireless/fiber link will join the administration and solids buildings.
- All projects are part of the Capital Improvement Plan currently under commission action, with funding via borrowing and implementation vendors not yet selected.
How to use pre-RFP signals
1. Shape the requirement
When you see a budget allocation or strategic plan mention, the agency is just beginning to define their need. Engage now to help write the specs before the RFP goes public.
2. Time your outreach
Don't cold call into the void. Use contract expiration signals to reach out to buyers exactly when they are unhappy with their incumbent or preparing to renew.
3. Arm your SDRs
Replace generic "checking in" emails with hyper-specific context. Reach out referencing their exact meeting minutes, named decision-makers, and approved budget line items.
FAQs
What is a pre-RFP signal for scada systems?
A pre-RFP signal is a public-record indicator that a buyer is moving toward a scada systems purchase before they've issued an RFP. Starbridge tracks six categories: meeting mentions, budget allocations, contract expirations, grant awards, leadership changes, and strategic plans.
How early does Starbridge detect scada systems demand?
Six to eighteen months before a formal RFP, on average. The earliest signals are usually board meeting mentions or budget line items.
What sources does Starbridge monitor?
Get your 10 highest-intent accounts
Share your ICP and we will surface 10 ready-to-buy accounts using buying signals, competitor contracts, and procurement activity for free.
- The JRWSS Capital Investment and Facilities Plan flags SCADA PLCs and radios as 10-20 years old, outdated, and vulnerable to cybersecurity risks.
- A scheduled replacement program (Table 47-1) plans PLC and cabinet upgrades across sites from FY27 through FY40, with Modicon M580 as the standard.
- A SCADA graphics and software update project is underway, with $150,000 budgeted in each of FY27 and FY28, shared with SCWD.
- The plan recommends moving PLCs from underground vaults to above-ground stainless-steel cabinets and adding remote-read capability to flow meters via SCADA.
- Specific SCADA procurement decisions and vendor selections for the replacement program are not yet detailed in the packet.
- Lakehaven Water and Sewer District's Board is set to approve a $2,990,821.28 contract with Carollo/TSI for SCADA migration and modernization across its water and sewer systems.
- The project spans the Sewer Pump Stations, Water System, and two Wastewater Treatment Plants, with a 24-month implementation starting January 2027.
- The District will procure hardware and infrastructure separately, with the total project cost estimated at approximately $3,250,000.
- The selected scope includes SCADA platform evaluation (AVEVA and Ignition), cybersecurity review, historian migration, and staff training.
- The hardware procurement remains open, as the board has not yet committed to a vendor or budget for that portion of the project.
- Township staff reported the Massie water treatment plant's SCADA system is long past its service life and was a budgeted 2026 item, prompting urgent action.
- Staff obtained quotes from two providers, with Nortech Power and Control bidding $18,500 and Ontario Clean Water Agency's IT group bidding $37,235, recommending the lower bid.
- Council awarded the SCADA replacement and upgrade contract to Nortech Power and Control for $18,500 plus taxes, with a six-to-eight-week integration timeline.
- The SCADA system is described as critical for real-time data collection and control of the plant, with a redundant RAID configuration, underscoring the urgency of replacement.
- Council moved into closed session following the award, leaving the contract decision as the final action on the SCADA matter.
Public meeting minutes, board agendas, budget documents, contract expiration data, grant awards, public job postings, and leadership announcements across all 50 states.
Do I have to talk to sales to get the scada systems report?
No. Enter your work email and the report is sent within minutes. A demo is optional.
What's in the free scada systems report?
Ranked buyers with active scada systems demand in your scope, open RFPs closing soon, expiring contracts with incumbent names, and verified buyer contacts.
How accurate are Starbridge's buyer contacts?
Validated against a 14,000-email test, Starbridge runs a 2% bounce rate. Comparable tools self-report 15 to 25%.