Metering Infrastructure RFPs, Pre-RFP Signals and Bid Opportunities
See emerging pre-RFP opportunities from public-sector buyers this week based on contract renewal timing, meetings and job changes, and paired with verified contact info.
- The Cabazon Water District board will vote on the Resource Monitor smart metering agreement at its December meeting, with the proposal and sample contract discussed at the November 17 session.
- Resource Monitor's proposal quantifies $83,000–$127,000 in annual unbilled water and 576 staff hours spent on manual reads, framing the need for AMI/AMR.
- The district is exploring grant funding for AMR meters with High Valleys Water District and SGPWA, and has an AMR quote valid until December 31, 2026.
- The proposal locks a $7 per meter per month fee for 10 years if signed by December 31, 2026, with a five-lot deployment scheduled from…
- Seattle Public Utilities is requesting $1.3 million to fund a temporary project team that will finalize a recommended approach for implementing Advanced Metering Infrastructure (AMI) across its water distribution system.
- SPU is currently evaluating AMI and intends to begin developing technical specifications and a Request for Proposals (RFP) for system procurement, signaling an active move toward competitive selection.
- The funding would support project management, technology, field operations, and analyst roles to lead the AMI planning and procurement process.
- The $1.3 million is part of the 2027-2028 Proposed Budget, which the…
- Town of Oliver's 2027 capital budget allocates $120,000 for an AMI water meter antenna project, classified as critical and prioritized P1.
- The project rationale notes the current AMR system requires manual or drive-by reads, while AMI enables fixed-network, near real-time data collection.
- A separate multi-year water meter replacement program swaps aging Neptune T-10 meters for Mach 10 meters at $300,000 per year through 2029.
- The budget also funds SCADA and PLC upgrades at $175,000 yearly for water and $125,000 for sewer, citing obsolete parts and unreliable data.
- The clerk reported that the town's Keystone billing software version is very outdated, prompting discussion of an upgrade.
- The utility superintendent explained that the town's SR2 meters are being discontinued, with no more being made, forcing a replacement.
- The board voted to authorize staff to investigate billing software and meter update options and bring back recommendations.
- Officials estimated the cost of a whole new system at around $300,000, including meters and reading infrastructure.
- The Citizens Advisory Committee voted to send staff's AMI meter recommendation to the full board for approval, following a detailed discussion.
- ECUA is running a pilot in the Buellah area, installing static meters readable via AMI or the existing drive-by system, with staff expecting to transition to AMI.
- Staff proposed funding the AMI project through new rates added to ECUA code chapter 14, with preliminary and final rate resolutions planned for December and January.
- The AMI initiative was described as a large capital project potentially funded through bonds, with installation pace dependent on whether work is done in-house or…
- Sunrise Water Authority is preparing a draft scope of services for an AMR/AMI RFP to modernize its metering process and technology.
- The board reached consensus to pursue a fixed-network RF meter read system after considering it against a cellular network option.
- About 10,000 meters currently use drive-by AMR reading, while 8,500 still require direct manual reading, showing reliance on legacy methods.
- A public comment titled 'Inconsistent Meter Readings' was entered into the record, highlighting customer billing accuracy concerns.
- Sunrise Water Authority is preparing a draft scope of services for an AMR/AMI RFP to modernize its metering process and technology.
- The board reached consensus to pursue a fixed-network RF meter read system after considering it against a cellular network option.
- About 10,000 meters currently use drive-by AMR reading, while 8,500 still require direct manual reading, showing reliance on legacy methods.
- A public comment titled 'Inconsistent Meter Readings' was entered into the record, highlighting customer billing accuracy concerns.
- The authority is piloting a smart leak detection program with 50 acoustic hydrant caps rotating across four zones, at an estimated $80,000 cost.
How to use pre-RFP signals
1. Shape the requirement
When you see a budget allocation or strategic plan mention, the agency is just beginning to define their need. Engage now to help write the specs before the RFP goes public.
2. Time your outreach
Don't cold call into the void. Use contract expiration signals to reach out to buyers exactly when they are unhappy with their incumbent or preparing to renew.
3. Arm your SDRs
Replace generic "checking in" emails with hyper-specific context. Reach out referencing their exact meeting minutes, named decision-makers, and approved budget line items.
FAQs
What is a pre-RFP signal for metering infrastructure?
A pre-RFP signal is a public-record indicator that a buyer is moving toward a metering infrastructure purchase before they've issued an RFP. Starbridge tracks six categories: meeting mentions, budget allocations, contract expirations, grant awards, leadership changes, and strategic plans.
How early does Starbridge detect metering infrastructure demand?
Six to eighteen months before a formal RFP, on average. The earliest signals are usually board meeting mentions or budget line items.
What sources does Starbridge monitor?
Get your 10 highest-intent accounts
Share your ICP and we will surface 10 ready-to-buy accounts using buying signals, competitor contracts, and procurement activity for free.
- Sunrise Water Authority is preparing a draft scope of services for an AMR/AMI request for proposal to modernize its metering process.
- The board has reached consensus to pursue a fixed-network RF meter read system after discussing fixed-network versus cellular options.
- Approximately 10,000 Sunrise meters use drive-by reads and 8,500 use direct manual reads, the systems targeted for replacement.
- A 50-unit hydrant cap leak detection pilot, costing $80,000, will rotate quarterly across four zones to track water loss reduction and leak-locating accuracy.
- No vendor has been selected for the metering RFP, and the scope of services is still being finalized.
- Sunrise's unaccounted-for water remains in the 5.5%-7.5% range, supporting the need for improved metering and leak detection.
- The Cabazon Water District board will vote on the Resource Monitor smart metering agreement at its December meeting, with the proposal and sample contract discussed at the November 17 session.
- Resource Monitor's proposal quantifies $83,000–$127,000 in annual unbilled water and 576 staff hours spent on manual reads, framing the need for AMI/AMR.
- The district is exploring grant funding for AMR meters with High Valleys Water District and SGPWA, and has an AMR quote valid until December 31, 2026.
- The proposal locks a $7 per meter per month fee for 10 years if signed by December 31, 2026, with a five-lot deployment scheduled from January to May 2027.
- The board has not yet selected a vendor; the December vote will determine whether this proposal is approved, keeping the outcome open.
- Seattle Public Utilities is requesting $1.3 million to fund a temporary project team that will finalize a recommended approach for implementing Advanced Metering Infrastructure (AMI) across its water distribution system.
- SPU is currently evaluating AMI and intends to begin developing technical specifications and a Request for Proposals (RFP) for system procurement, signaling an active move toward competitive selection.
- The funding would support project management, technology, field operations, and analyst roles to lead the AMI planning and procurement process.
- The $1.3 million is part of the 2027-2028 Proposed Budget, which the Seattle City Council Select Budget Committee is scheduled to discuss, brief, and possibly vote on.
- The City Council's approval of the budget, which includes this AMI planning funding, remains pending, and no vendor has been selected for the eventual system procurement.
- Town of Oliver's 2027 capital budget allocates $120,000 for an AMI water meter antenna project, classified as critical and prioritized P1.
- The project rationale notes the current AMR system requires manual or drive-by reads, while AMI enables fixed-network, near real-time data collection.
- A separate multi-year water meter replacement program swaps aging Neptune T-10 meters for Mach 10 meters at $300,000 per year through 2029.
- The budget also funds SCADA and PLC upgrades at $175,000 yearly for water and $125,000 for sewer, citing obsolete parts and unreliable data.
- Council will consider adopting the 2027-2031 capital and operating budgets, including a 7% rate increase, at its November 16, 2026 meeting.
- The budget documents do not confirm that a vendor has been selected or that an RFP has been issued for the AMI project.
Public meeting minutes, board agendas, budget documents, contract expiration data, grant awards, public job postings, and leadership announcements across all 50 states.
Do I have to talk to sales to get the metering infrastructure report?
No. Enter your work email and the report is sent within minutes. A demo is optional.
What's in the free metering infrastructure report?
Ranked buyers with active metering infrastructure demand in your scope, open RFPs closing soon, expiring contracts with incumbent names, and verified buyer contacts.
How accurate are Starbridge's buyer contacts?
Validated against a 14,000-email test, Starbridge runs a 2% bounce rate. Comparable tools self-report 15 to 25%.