CityIL
Posted
Sep 30, 2026
Dec 3, 2026
Advanced Metering Infrastructure (AMI) - Request for Proposal
Provide an advanced metering infrastructure (AMI) system for its electric utility.
Description: Procurement of a new Advanced Metering Infrastructure (AMI) system for Gridley’s electric utility, with scalability for potential future water AMI.
City · CA, US
Adjacent opportunities open for bidding right now.
CityIL
Posted
Sep 30, 2026
Dec 3, 2026
Provide an advanced metering infrastructure (AMI) system for its electric utility.
Georgetown Municipal Water and Sewer Service
Special DistrictKY
Posted
Oct 22, 2026
Dec 17, 2026
GMWSS is requesting proposals from qualified vendors to provide an Advanced Metering Infrastructure (AMI) system, including water meters, meter interface units, a data collection network, head-end and meter data management software, and installation, for its approximately 16,112 water meters.
CityCA
Posted
Sep 30, 2026
Nov 17, 2026
Provide a full turnkey AMI solution. The work shall include system design, procurement, installation, testing, commissioning, training, and ongoing support. Contractor shall evaluate existing Sensus meters and determine compatibility with proposed AMI endpoints. Where feasible, existing meters may be retained; however, the Contractor shall ensure that the final system meets all performance requirements regardless of reuse strategies.
CityCA
Posted
Sep 30, 2026
Nov 17, 2026
Provide a full turnkey AMI solution. The work shall include system design, procurement, installation, testing, commissioning, training, and ongoing support. Contractor shall evaluate existing Sensus meters and determine compatibility with proposed AMI endpoints. Where feasible, existing meters may be retained; however, the Contractor shall ensure that the final system meets all performance requirements regardless of reuse strategies.
Decision makers connected to this RFP from City of Gridley.
Solicitation files and supporting documents for this bid.