RFP Catalog/Retail & Commercial Development

Retail & Commercial Development RFPs

Track retail and commercial development RFP opportunities from state development agencies, county planning departments, and municipal development offices. Discover solicitations for commercial construction, retail development, and franchise construction projects updated daily.

Texas Department of Transportation

Provide landscape development.

Posted Date

May 8, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
Texas Department of Transportation

The Texas Department of Transportation is soliciting bids for a state-let construction contract for landscape development at various locations in Travis County. The project has an estimated cost of $500,263.00 and a completion period of 53 working days, including planting and maintenance. Bids are scheduled for the June 2026 TxDOT letting, and the solicitation is currently open for responses.

Posted Date

May 8, 2026

Due Date

Jun 3, 2026

Timeline Progress91%
Texas Department of Transportation

The Texas Department of Transportation issued a State-Let construction contract for landscape development along various highways in Williamson County, including IH 35, FM 972, US 79, and SH 95. The project has an estimated value of approximately $2,098,984.02 and a completion time of 129 working days. Bids are due by June 2, 2026, and official bidding information is available through the Electronic State Business Daily.

Posted Date

May 8, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
Vermont Department of Buildings and General Services

The General Services Administration (GSA), Public Buildings Service (PBS) intends to hire a construction contractor to perform Repair & Alteration (R&A) work with an optional Driveway Extension at the Alburg Springs Land Port of Entry (LPOE) in Vermont. The project will use Design-Bid-Build delivery, includes upgrades such as gates, guardrails, a new officer inspection booth, interior and MEP/security improvements, and must incorporate the existing historic facility. A pre-proposal conference/site visit is scheduled for May 6, 2026 and proposals are due June 15, 2026.

Posted Date

Apr 16, 2026

Due Date

Jun 15, 2026

Timeline Progress76%
Pasadena Unified School District

DESIGN-BUILD. From qualified design-build entities (“DBEs” or Firm(s)”) to perform design-build services as authorized by Education Code section 17250.60, et seq., for the design-build services required for the construction Employee Housing Project (“Project”). All prospective design-build entities that seek to contract with the District to perform the Project must respond to this RFQ/P. The selected Firm shall perform design and engineering services, (preparation of plans and technical specifications), preconstruction and construction services, installation, programming, field testing, training, and commissioning services (“Services”) at the former Roosevelt Elementary School Site District site(s) (“Site”) for the District’s employee workforce housing project. The employee workforce housing development will be comprised of two-story or three-story buildings with a total of 110 rental units to be made available to District staff. The Project will include a mix of one-, two-, three-, and four-bedroom units, totaling approx. 125,000 SF of gross residential building area, and approx. 170,000 SF of total gross building area including standalone garages and an amenity building. The District has completed the schematic design (entitlement plan set) for the project.

Posted Date

May 13, 2026

Due Date

Jun 19, 2026

Timeline Progress51%
General Services Administration

"DESIGN-BUILD" The main goal for this project is to provide a renovated LPOE with the addition of a driveway extension for CBP and GSA that will meet each agency’s requirements and allow for efficient operations. The R&A portion is needed to modernize the port, correct port deficiencies, and bring the LPOE up to current standards based on the Program of Requirements provided by GSA and CBP. The project will be completed in a way that will incorporate the existing Historic Facility, which is listed in the National Register of Historic Places. Major elements of the project will include gates and guardrails for primary passenger and commercial lanes, a new officer inspection booth, interior upgrades, such as all new floorplan, and new and upgraded MEP and Security. The driveway portion will address the security challenges at the LPOE with local traffic entering and exiting their residential properties directly in front of the port.

Posted Date

Feb 27, 2026

Due Date

Jun 15, 2026

Timeline Progress87%
Region 17 Education Service Center

The Garland VA Medical Center is seeking to construct a new energy center to replace its outdated and noncompliant boiler plant and energy supply system. The project involves a design-build construction contract with an estimated total period of performance of 1,542 calendar days. This solicitation is a Sources Sought notice to identify capable contractors for the project lifecycle from design through construction.

Posted Date

May 15, 2026

Due Date

Jun 5, 2026

Timeline Progress80%
Public Buildings Service

The U.S. General Services Administration (GSA), Public Buildings Service, seeks a construction contractor to perform a Repair & Alteration (R&A) and optional Driveway Extension at the Alburg Springs Land Port of Entry (LPOE) in Alburgh, Vermont. The project will modernize the historic LPOE (on the National Register of Historic Places), include new gates/guardrails, a new officer inspection booth, interior and MEP/security upgrades, and will be delivered via the Design-Bid-Build method; one award is anticipated. The procurement is full and open, requires a performance bond, and has an estimated cost of $10,000,000–$15,000,000.

Posted Date

Feb 27, 2026

Due Date

Jun 1, 2026

Timeline Progress100%
New Haven Housing Authority

Provide construction manager at risk to support the predevelopment, preconstruction, and construction of lots 1a and 1b.

Posted Date

May 6, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
Pittsburgh Water And Sewer Authority

Pittsburgh Water and Sewer Authority is soliciting qualified construction management and construction inspection (CM/CI) firms to provide private construction of public utilities management and inspection services under a task-order indefinite-delivery, indefinite-quantity contract, with task orders generally not to exceed $425,000 each. The contract term begins upon issuance of a Notice to Proceed for one year with up to four one-year extensions; firms must demonstrate relevant experience, financial stability, and required staffing, and the procurement encourages participation by MBE/WBE/SBE/VBE/DOBE/LGBTBE firms. The opportunity is open with questions due 2026-06-10 and proposals due 2026-06-18; required solicitation attachments (RFP PDF and submission instructions) are posted on the buyer portal but require vendor login to download.

Posted Date

May 21, 2026

Due Date

Jun 18, 2026

Timeline Progress38%
U.S. Army Engineer District New York

Construction of new child development center. Construction of a new Child Development Center (16,632 SF) with adjacent outdoor play areas (16,667 SF) for children between the ages of 6 weeks and 5 years of age. Work will include installation of information systems, video monitoring, alarm and intercom systems. Heating and air conditioning will be provided by self-contained system. See attached file.

Posted Date

May 27, 2026

Due Date

Jun 29, 2026

Timeline Progress14%
257-Network Contract Office 17 (36C257)

DESIGN BUILD: Requires the construction of a new, fully operational energy center to replace its outdated, noncompliant, and insufficient existing boiler and utility systems. The new energy center will be a single-story, stand-alone high-rise structure housing major mechanical, electrical, steam, chilled water, fuel oil, bulk oxygen, and standby power generation components.

Posted Date

May 15, 2026

Due Date

Jun 5, 2026

Timeline Progress80%
City of Green River

Procurement of a private operator for the development, permitting, construction, and long-term operation of a Class IVb Construction and Demolition (C&D) landfill.

Posted Date

May 4, 2026

Due Date

Jun 19, 2026

Timeline Progress60%
Duncanville Independent School District

Provide retail/general merchandise stores, grocery stores, food suppliers & restaurant/catering.

Posted Date

Jul 7, 2025

Due Date

Jun 22, 2026

Timeline Progress94%
Battle Ground School District 119

work includes: New, fully complete 8,100 SF wood framed building on the Battle Ground High School campus. Building will include classrooms, shops, and support areas for construction trades vocational training.

Posted Date

May 15, 2026

Due Date

Jun 2, 2026

Timeline Progress93%
City of Martinsville

The City of Martinsville (VA) is soliciting proposals for Pre-Construction and Construction Management Services for projects in Martinsville. The solicitation was posted on May 26, 2026, and is currently open with a response deadline of June 30, 2026. Interested firms must consult the City’s official vendor portal for the full solicitation text and submission instructions.

Posted Date

May 26, 2026

Due Date

Jun 30, 2026

Timeline Progress16%
Utah Department of Government Operations

This solicitation constitutes Phase 2 of the State’s pilot Progressive Design-Build procurement and is intended to select the Architect/Design Team that will join Zwick/Suffolk JV, DFCM, and Dixie Technical College as part of the final Progressive Design-Build team.

Posted Date

May 26, 2026

Due Date

Jun 12, 2026

Timeline Progress34%
Amarillo Habitat for Humanity, Inc

Construction Services for New, Residential Construction Projects. Homes will be three- to five-bedroom, two-bathroom structures under 1,800 SF The organization anticipates a minimum of three projects per calendar year. Description of Work Electrical - New residential construction Concrete - Slab, flatwork & retaining walls Granite - Kitchen & bathroom countertops Flooring - Vinyl and carpet HVAC - Central heat (natural gas) & air Insulation - Spray foam Plumbing - New residential construction & water/sewer taps Portable Restrooms - One per project site Roofing - Composite shingle roof Tape/Texture - New residential construction

Posted Date

Apr 13, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
Lake Sumter State College

Design-build: provide design and construction services for the workforce development center.

Posted Date

May 12, 2026

Due Date

Jun 16, 2026

Timeline Progress56%
Michigan Department of Technology, Management and Budget

Design-build project: construction of a drainage tunnel, tunnel components, and a pump station.

Posted Date

Apr 3, 2026

Due Date

Aug 28, 2026

Timeline Progress40%

Win More Retail & Commercial Development RFPs

Get AI-powered buying signals and real-time alerts for retail & commercial development opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available