RFP Catalog/Building Automation System

Building Automation System RFPs

Browse active Building Automation System RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

The University of Alabama

Construction of a building with demolition and abatement.

Posted Date

May 3, 2026

Due Date

Jun 4, 2026

Timeline Progress90%
Pend Oreille County

Demolish and dispose of existing agricultural building. Erect a new pole-style building, supplied by the owner. Install electrical, and pour and finish a concrete floor.

Posted Date

May 8, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
DLA Aviation

Building control system (BCS) and utility control system (UCS) maintenance and support services.

Posted Date

May 13, 2026

Due Date

Jun 30, 2026

Timeline Progress39%
Alaska Aerospace Corporation

2 pre-engineered metal building - vehicle integration building.

Posted Date

May 15, 2026

Due Date

Jun 9, 2026

Timeline Progress67%
Alaska Department of Military and Veterans Affairs

The Alaska Aerospace Corporation (AAC) is seeking contractors to design, supply, transport and install two Vehicle Integration Buildings (pre-engineered metal buildings) at the Pacific Spaceport Complex – Alaska (Kodiak). The work includes design and installation of two identical pre-engineered metal buildings engineered for severe Kodiak Island conditions (high wind, snow, seismic design, and corrosion mitigation), and compliance with applicable codes and PE-reviewed structural calculations. The solicitation includes design drawings and an ITB/solicitation document listed in the notice attachments and is a procurement (not a grant).

Posted Date

May 15, 2026

Due Date

Jun 11, 2026

Timeline Progress62%
Rockingham Community College

Work includes to conduct site improvements to address clearing and grading of building pad for 60' x 60' pre-engineered building. Construction of slab on grade concrete pad, setting anchor bolts, interior upfit of the pre-engineered building to address installation of the mechanical ventilation system and unit heaters, placement of three overhead coiling doors, electrical power and overhead lighting.

Posted Date

May 5, 2026

Due Date

Jun 9, 2026

Timeline Progress76%
Delta Public Transit

Provide vehicle/building insurance.

Posted Date

Mar 6, 2024

Due Date

Jun 30, 2026

Timeline Progress97%
State of Tennessee

To perform building inspections of construction of one- and two-family homes.

Posted Date

Nov 18, 2025

Due Date

Jun 30, 2026

Timeline Progress87%
JAMM Transit

Provide Vehicle/Building Insurance.

Posted Date

Apr 3, 2025

Due Date

Aug 31, 2026

Timeline Progress82%
Town of Beaver

Provide vehicle/building insurance.

Posted Date

Mar 13, 2025

Due Date

Aug 31, 2026

Timeline Progress83%
East Windsor Municipal Utilities Authority

Construction of two (2) buildings at the project site. Building One is a structure to house the administrative functions of the Owner and Building Two is a structure to house the maintenance operations of the Owner. In addition to the structures, both buildings require full electrical, HVAC, and Plumbing systems. Site work includes foundation excavation, connection of public utilities at the street, and regrading of the site.

Posted Date

Apr 3, 2026

Due Date

Jun 24, 2026

Timeline Progress72%
City of Painesville

Work includes wtp chlorine building.

Posted Date

May 18, 2026

Due Date

Jun 15, 2026

Timeline Progress49%
New York State Office of General Services

Construction work and electrical work, provide storage building.

Posted Date

Jun 18, 2015

Due Date

Jun 17, 2026

Timeline Progress100%
Heartland Community College

Glazing and sealing replacement.

Posted Date

May 19, 2026

Due Date

Jun 9, 2026

Timeline Progress61%
City of Jonesboro

Project scope consists of an approximately 8,800 SF single story building with a conventional spread footing foundation system and a hardened shell exterior.

Posted Date

May 18, 2026

Due Date

Jun 4, 2026

Timeline Progress81%
City of Indian River Shores

Work inlcudes building department addition

Posted Date

May 15, 2026

Due Date

Jun 15, 2026

Timeline Progress54%
Orange County Transportation Authority

Work may include, but is not limited to, painting of building interiors and exteriors, structural elements, railings, fencing, equipment, and other facility-related assets.

Posted Date

May 11, 2026

Due Date

Jun 8, 2026

Timeline Progress74%
Bridgeton Public School District

Administration building sitework.

Posted Date

May 25, 2026

Due Date

Jun 2, 2026

Timeline Progress84%
Borough of Harveys Lake

Construction of the public safety building.

Posted Date

May 26, 2026

Due Date

Jun 16, 2026

Timeline Progress27%
City of Alliance

Clean up after fire department training and remaining demolition.

Posted Date

May 27, 2026

Due Date

Jun 10, 2026

Timeline Progress34%

Win More Building Automation System RFPs

Get AI-powered buying signals and real-time alerts for building automation system opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available