RFP Catalog/Building Automation System

Building Automation System RFPs

Browse active Building Automation System RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

Kershaw County

Kershaw County is soliciting bids from licensed commercial contractors to design and construct a 40 ft by 40 ft storage building at the Westville Fire Service station at 2 Payne Pond Road, Westville, SC (Bid #25-202-06). Bidders must submit architect-stamped plans compliant with Kershaw County commercial building codes, attend a mandatory site visit on July 6, 2026, and submit all written questions by July 7, 2026. Sealed bids accompanied by 5% bid security plus 100% performance and payment bonds must be received before 3:00 p.m. local time on August 3, 2026.

Posted Date

Jun 26, 2026

Due Date

Aug 3, 2026

Timeline Progress60%
Pittsburg County

Construction of a fire department building.

Posted Date

Apr 20, 2026

Due Date

Jul 31, 2026

Timeline Progress88%
University of Minnesota System

The University of Minnesota is soliciting proposals from qualified architectural firms to provide Design Services for a New Academic Building that will serve the University of Minnesota Rochester (UMR) campus. The project is part of the broader UMR Elevate Extraordinary 2030 facilities expansion plan and is intended to create a flagship academic building housing high-tech active-learning classrooms, faculty spaces, and other instructional infrastructure. Proposals must be submitted through the University of Minnesota's MBID (Ionwave) bidding portal by 2:00 PM Central Time on July 27, 2026, with a question cut-off date of July 20, 2026.

Posted Date

Jul 1, 2026

Due Date

Jul 27, 2026

Timeline Progress68%
Spokane Airport Board

The Spokane Airport Board is seeking sealed bids from qualified contractors to perform the ARFF Building HVAC Maintenance project under Invitation to Bid (ITB) #26-46-1885. The scope of work includes replacing hydronic HVAC gaskets and components, then testing and restoring the system at the Spokane International Airport ARFF (Aircraft Rescue and Fire Fighting) facility. A mandatory pre-bid meeting was scheduled for July 7, 2026, and sealed bids must be received by 2:30 PM on July 21, 2026, with full contract documents available through the airport's online plan room.

Posted Date

Jul 1, 2026

Due Date

Jul 21, 2026

Timeline Progress89%
Palm Springs Unified School District

Work includes of the alteration of an existing office building. Interior improvements to offices and training rooms, including mep upgrades, roofing improvements, and hvac system upgrades.

Posted Date

Jul 1, 2026

Due Date

Aug 6, 2026

Timeline Progress49%
Coastal Alabama Community College

Renovations to the library and stone building.

Posted Date

Mar 11, 2026

Due Date

Jul 23, 2026

Timeline Progress97%
Marine Corps Installations East

This is a federal contract solicitation (N4008526R9060) for roof repairs to Building 1860 at Marine Corps Base Camp Lejeune, North Carolina. The contracting activity is the Naval Facilities Engineering Command and the opportunity is posted on SAM.GOV; proposals are due Aug 3, 2026 at 01:00 PM EDT. No primary solicitation PDF/DOC was found in the provided sources, so interested offerors should retrieve full solicitation documents from the SAM.GOV opportunity page.

Posted Date

-

Due Date

Aug 3, 2026

Tennessee Department of Commerce and Insurance

The intent to award contracts for building inspection services for the construction of one- and two-family homes, as a deputy inspector.

Posted Date

Jul 1, 2026

Due Date

Jun 30, 2027

Timeline Progress5%
Nunavut

The Government of Nunavut is soliciting bids for the Qimugjuk Building Envelope Replacement project at the Qimugjuk Government Building in Iqaluit, Nunavut. The work involves the replacement of the building envelope (structural exterior) of the Qimugjuk Building, located at 969 Qimugjuk Building, 1st Floor, Iqaluit, Nunavut (X0A 0H0). Bids are due by July 24, 2026, at which time the solicitation expires.

Posted Date

Jul 4, 2026

Due Date

Jul 24, 2026

Timeline Progress74%
Florence School District 1

Work includes construction of tiny homes and community building for fsd1 and the house of hope.

Posted Date

Jun 25, 2026

Due Date

Jul 23, 2026

Timeline Progress85%
Isle of Wight County Schools

Provide construction of an approx 10,623 SF new fleet administration, operations and maintenance facility and associated sitework. Building construction includes concrete spread footings, masonry foundation walls, concrete slab-on-grade, and a pre-engineered steel framed metal building shell. Exterior finishes include metal wall panels and standing seam metal roof. Exterior windows and doors are prefinished aluminum storefront, hollow metal doors and frames and insulated sectional doors. The interior floors are sealed concrete. Interior walls are painted cmu and abuse resistant gypsum drywall.

Posted Date

Jun 29, 2026

Due Date

Jul 28, 2026

Timeline Progress68%
Van Buren Public Schools

Van Buren Public Schools is soliciting bids for the construction of an Operations Building/Bus Garage. Bids must be submitted electronically by August 4, 2026 at 11:00 a.m. local time, and a non-mandatory pre-bid conference is scheduled for July 16, 2026; bidders must provide a 5% bid security and may be required to furnish 100% performance and payment bonds. The solicitation requires multiple affidavits/disclosures (familial relationship disclosure, Iran Economic Sanctions compliance, criminal background disclosure, and non-collusive affidavit) and lists a contact for questions.

Posted Date

Jul 9, 2026

Due Date

Aug 4, 2026

Timeline Progress38%
Victor Valley College

Work consists of removal of all existing decorative metal panel roofing and asphalt shingles on building 10; application of ft3 base sheet in all areas; installation of metal panels over the base sheet; installation of new metal flashings.

Posted Date

-

Due Date

Jul 27, 2026

North Carolina State University At Raleigh

Seeking general contractors for the demolition of the council building, an approx 58,000 SF building. The project will also include some site restoration of landscaping upon removal of the building as well as capping utilities.

Posted Date

Mar 8, 2026

Due Date

Aug 12, 2026

Timeline Progress85%
North Carolina State University At Raleigh

Seeking general contractors for the demolition of the council building, an approx 58,000 SF building. The project will also include some site restoration of landscaping upon removal of the building as well as capping utilities.

Posted Date

Mar 8, 2026

Due Date

Aug 12, 2026

Timeline Progress85%
City of Loup City

The City of Loup City, Nebraska is accepting sealed bids for the demolition of four nuisance properties located within the city: 319 N 10th Street, 167 P Street, 447 N 4th Street, and 529 R Street. Bidders must provide all labor, equipment, and materials necessary to complete the demolition work, with separate sealed bids required for each property address. Sealed bids must be submitted to City Clerk AJ Reimers at PO Box 250, Loup City, NE 68853 (phone 308-233-7255) no later than 4:00 PM on July 30, 2026.

Posted Date

Jul 14, 2026

Due Date

Jul 30, 2026

Timeline Progress30%
City of Port Arthur

Concrete building materials.

Posted Date

Jul 15, 2026

Due Date

Jul 29, 2026

Timeline Progress27%
California Military Department

Scope of work includes, but is not limited to: demolition of existing site and building components to accommodate new floor plan. Hazardous materials abatement. Site civil - new concrete pad for driveway. New accessible parking, new accessible path of travel and new utilities to accommodate the program. Structural - new foundations, shear walls, new wall framing and repair work. Architectural: construction of new walls, doors, windows, roofing system, exterior siding, interior floor, wall and ceiling finishes. Accessibility upgrades. Mechanical - new mechanical system with controls. Electrical - new electrical components and light fixtures to accommodate new floor plan and building program. Fire alarm - this work requires a deferred submittal. Contractor to submit drawings for cmd approval.

Posted Date

Jul 15, 2026

Due Date

Sep 1, 2026

Timeline Progress8%
Bethel Township

Construction of a 3,600 sf municipal storage building.

Posted Date

Jul 8, 2026

Due Date

Aug 13, 2026

Timeline Progress30%
International Boundary And Water Commission: U.S.-Mexico

DESIGN-BUILD: The emergency generator at Retamal Dam is no longer working and rreplacment is necessary. The new generator will be housed in a metal building installed on a new concrete pad with a modern diesel fuel tank. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing.

Posted Date

Jun 2, 2026

Due Date

Aug 4, 2026

Timeline Progress74%

Win More Building Automation System RFPs

Get AI-powered buying signals and real-time alerts for building automation system opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available