The Town of Manalapan is seeking qualifications for Construction Manager at Risk services for demolition of the existing Town Hall/Police Station and construction of a combined municipal facility at 131 South Ocean Boulevard. Services include preconstruction estimating, scheduling, design reviews and value engineering, subcontractor procurement, and delivery of a Guaranteed Maximum Price. The project emphasizes energy efficiency, sustainable materials, renewable-energy options, durability of at least 50 years, and low-impact site management.
Buyer Attributes
Key metrics and characteristics
Census ID
Government ID for mapping buyers across datasets.
124273
Population
Population size to gauge opportunity scale.
445
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Town of Manalapan
Town Commission of Manalapan Town Commission Meeting
Date: May 12, 2026Type: Meeting mention
The Town Commission approved several zoning ordinances related to official mapping and waterway zones. The meeting included presentations on the Fire Rescue annual report and 3-D printed living seawalls for shoreline protection. Commissioners approved a special exception request for a dance studio and passed an ordinance regarding prohibited fishing activities. Additionally, updates were provided on infrastructure projects, including road improvements, guardhouse construction, a septic to sewer project, and a preliminary exploration regarding local zip code designation.
Architectural Commission Meeting
Date: May 7, 2026Type: Meeting mention
The Architectural Commission reviewed and approved two project applications. The first involved an enclosure for an existing second-story terrace at 1780 S. Ocean Blvd to create a home office. The second project at 750 S. Ocean Blvd involved a significant two-story addition, including a new garage and glass enclosure, which was approved with specific conditions requiring the removal of second-floor sconces, the addition of three windows, and the removal of a generator from the proposal.
Architectural Commission Meeting
Key Contacts
Public-sector contacts connected to Town of Manalapan.
The Architectural Commission reviewed and approved three project applications. Case AR-26-10 involved minor modifications to the front entrance of a residence at 114 Evans Lane, including enclosing an existing porch and constructing a new open porch. Case AR-26-11 concerned the construction of a new service driveway, gate, and piers at 1900 S. Ocean Blvd. Case AR-26-12 focused on significant alterations to the North Villa, including renovations to address water and mold issues, exterior roof and window upgrades, and an expansion of the existing tennis building with a new second floor and exterior cladding.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Town of Manalapan meetings, strategic plans, and budget discussions before the public bid appears.