Ringwood 2026 CDBG Walking Trail, #2605 RFP
Posted
Aug 14, 2026
Sep 18, 2026
Work includes 901 SY 4" concrete sidewalk; 36 SY 6" concrete sidewalk; 592 SY 5" asphalt driveway; 1,173 SY solid slab sodding; 2,915 LF barb wire fencing; 475 LF 6" curb & gutter; 1 EA 24' entrance gate; 882 LF gravel parking area; 1 EA ada compliant access ramp; 12 LF 8" cmp drainage culvert.