CityIL
Posted
Aug 27, 2026
Oct 1, 2026
Township Park District Community Park Hot-Mix Asphalt Walking Trail RFP
The project consists of constructing 2970 LF of a hot-mix asphalt walking trail, and the ancillary work to complete the project.
Description: Work includes 901 SY 4" concrete sidewalk; 36 SY 6" concrete sidewalk; 592 SY 5" asphalt driveway; 1,173 SY solid slab sodding; 2,915 LF barb wire fencing; 475 LF 6" curb & gutter; 1 EA 24' entrance gate; 882 LF gravel parking area; 1 EA ada compliant access ramp; 12 LF 8" cmp drainage culvert.
City · OK, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityIL
Posted
Aug 27, 2026
Oct 1, 2026
The project consists of constructing 2970 LF of a hot-mix asphalt walking trail, and the ancillary work to complete the project.
CityTN
Posted
Jun 16, 2026
Sep 22, 2026
Work includes the repair of a portion of the walking trail at city park. The portion of the walking trail has become deteriorated over time due erosion.
CityTX
Posted
Aug 28, 2026
Sep 17, 2026
This is an open procurement IFB, not a grant, through which the City of Frisco is seeking an annual fixed-price contract for preventative maintenance of City generators. Control-panel programming, configuration, troubleshooting, modification, and software-related work must be performed by a qualified and manufacturer-authorized technician, with periodic service, repair, installation, maintenance, and testing included. The opportunity opened on August 28, 2026, and submissions are due September 17, 2026, at 2:00 PM CDT, with intent to bid required by the same deadline.
CityPA
Posted
Aug 27, 2026
Sep 18, 2026
Work include resurfacing approx., 635 SY of an existing 4-foot-wide by 1,422-foot-long asphalt pedestrian trail with a 0.75" superpave WMA scratch course (35 tons) and a 1.5" superpave WMA 9. 5 mm wearing course. The work also includes removal and excavation of approx., 60 SY of failed trail pavement to a 10-inch depth, installation of 10 tons of 2a stone base, placement of 16 tons of 19 mm superpave binder course, and all necessary appurtenances for construction.