Highbury Park Walking Trail Improvements
Posted
Aug 27, 2026
Sep 18, 2026
Work include resurfacing approx., 635 SY of an existing 4-foot-wide by 1,422-foot-long asphalt pedestrian trail with a 0.75" superpave WMA scratch course (35 tons) and a 1.5" superpave WMA 9. 5 mm wearing course. The work also includes removal and excavation of approx., 60 SY of failed trail pavement to a 10-inch depth, installation of 10 tons of 2a stone base, placement of 16 tons of 19 mm superpave binder course, and all necessary appurtenances for construction.
