Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Orinda Union School District
Consists of transitional and Kinder play yard replacement including: replacement of flatwork including asphalt, rubber surfacing and sandbox in Play Area. Install of two new play structure (OFCI-owner furnished, contractor installed) over poured-in-place safety surfacing, replacement of fences and gates, addition of wood fence at the toe of the hill, The addition of trees, plants and associated irrigations, 18" concrete Seat walls, installation of site furniture and alternates.
Posted Date
-
Due Date
Mar 26, 2026
Orinda Union School District
Close: Mar 26, 2026
Consists of transitional and Kinder play yard replacement including: replacement of flatwork including asphalt, rubber surfacing and sandbox in Play Area. Install of two new play structure (OFCI-owner furnished, contractor installed) over poured-in-place safety surfacing, replacement of fences and gates, addition of wood fence at the toe of the hill, The addition of trees, plants and associated irrigations, 18" concrete Seat walls, installation of site furniture and alternates.
Orinda Union School District
Work consists of temporary installment of a portable building and associated site and utility work. Also includes, the demolition and disposal of an existing ball wall, and demolition and disposal of two (2) each basketball posts.
Posted Date
Mar 28, 2025
Due Date
Apr 29, 2025
Release: Mar 28, 2025
Orinda Union School District
Close: Apr 29, 2025
Work consists of temporary installment of a portable building and associated site and utility work. Also includes, the demolition and disposal of an existing ball wall, and demolition and disposal of two (2) each basketball posts.
Orinda Union School District
Project consists of: Re-grade and level existing AC paved Kinder Play Yard. Install new play structure over poured-in-place safety surfacing. Install two (2) new shade structures (PC #04- 121917). Install new drinking fountain, add striping and play equipment, install new 6' high accessible gates at play area, and revise existing fencing. Scope includes associated ADA upgrades and path of travel, as well as storm drain work.
Posted Date
Feb 10, 2025
Due Date
Mar 20, 2025
Release: Feb 10, 2025
Orinda Union School District
Close: Mar 20, 2025
Project consists of: Re-grade and level existing AC paved Kinder Play Yard. Install new play structure over poured-in-place safety surfacing. Install two (2) new shade structures (PC #04- 121917). Install new drinking fountain, add striping and play equipment, install new 6' high accessible gates at play area, and revise existing fencing. Scope includes associated ADA upgrades and path of travel, as well as storm drain work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Orinda Union School District
The board conducted a governance workshop led by Luan Rivera focused on leadership development. The meeting also included an opening procedural session to adopt the agenda and a discussion regarding potential future agenda items.
This document outlines the Orinda Union School District's strategic directions and the Board of Trustees' goals for 2024-2025. Key strategic pillars include Student-Centered Learning, fostering a Community of Belonging, securing a Dedicated Staff, and ensuring Financial Stability and Resource Management. The plan aims to inspire, engage, and support all students, drive academic growth, cultivate an inclusive community, recruit and retain skilled staff, and maintain financial health through strategic stewardship.
The meeting provided a quarterly update on School Bond Measures E and I, focusing on academic excellence, student safety, and facility repairs. The presentation included the project status for various school sites, including HVAC installations, mechanical and electrical upgrades, and modernization projects at multiple schools. Additionally, a detailed financial overview was presented, summarizing expenditures, encumbrances, and project budgets for both Measure E and Measure I.
The board meeting focused on the modernization scope for various school sites, including Orinda Intermediate School, Del Rey, Glorietta, Sleepy Hollow, and Wagner Ranch. Key discussion topics included the analysis of two categories of modernization work—accessibility upgrades, window installations, insulation, ceiling fan additions, and technology improvements—alongside a review of optional scope items such as flooring, exterior painting, door and hardware replacements, and HVAC adjustments. The Bond Executive Team provided recommendations on reducing the project scope to achieve cost savings, and financial estimates were presented including escalation, soft costs, and contingencies.
The Single School Plan for Student Achievement outlines actions to improve the academic performance of all students at Glorietta Elementary School. This plan, spanning 2023-2024, focuses on key strategic priorities including enhancing Language Arts, Mathematics, and Science instruction through data analysis, curriculum alignment, and differentiated learning. Additionally, it addresses school safety within the physical environment and strengthens social-emotional learning supports to foster an inclusive and diverse school climate. The overall objective is to cultivate lifelong learners and engaged, productive citizens by supporting each child's educational journey through collaboration, critical thinking, and creativity.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Orinda Union School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Executive Director of Educational Services
Premium
Access the largest public sector contact database
© 2026 Starbridge