City of Lexington
The Drainage Improvements which includes (all values are approximate) 27 stormdrain structures, 1150 LF of 15” to 24” HDPE Pipe, 32 LF of RCP, several short concrete aprons/channels, bypass pumping, restoration, appurtenances, and associated concrete and asphalt work. Also included are relocations of interfering utilities including water, sanitary sewer, and stormdrain. Relocations of other utilities such as gas, electric, fiber optic, and communications, shall be coordinated by the Contractor. Price shall encompass a complete project, per the plans and specifications, to include mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bypass pumping, bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; re-establishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Posted Date
Feb 16, 2026
Due Date
Mar 26, 2026
Release: Feb 16, 2026
City of Lexington
Close: Mar 26, 2026
The Drainage Improvements which includes (all values are approximate) 27 stormdrain structures, 1150 LF of 15” to 24” HDPE Pipe, 32 LF of RCP, several short concrete aprons/channels, bypass pumping, restoration, appurtenances, and associated concrete and asphalt work. Also included are relocations of interfering utilities including water, sanitary sewer, and stormdrain. Relocations of other utilities such as gas, electric, fiber optic, and communications, shall be coordinated by the Contractor. Price shall encompass a complete project, per the plans and specifications, to include mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bypass pumping, bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; re-establishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
AvailableCity of Lexington
The Project includes the installation of approx 1,800 LF of 6" through 8" diameter water mains and appurtenances; 5,400 LF of 4" through 10" diameter sewer mains, manholes, and appurtenances, and 1,700 LF of 15" through 24" storm sewers, manholes, inlets, and appurtenances.
Posted Date
Feb 19, 2026
Due Date
Mar 26, 2026
Release: Feb 19, 2026
City of Lexington
Close: Mar 26, 2026
The Project includes the installation of approx 1,800 LF of 6" through 8" diameter water mains and appurtenances; 5,400 LF of 4" through 10" diameter sewer mains, manholes, and appurtenances, and 1,700 LF of 15" through 24" storm sewers, manholes, inlets, and appurtenances.
AvailableCity of Lexington
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
City of Lexington
Close: Jan 14, 2026
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lexington Public Works Dept.
The meeting addressed several administrative and operational matters. Key discussions included the process for the possible Redistricting Special Election ballot order and the appointment of Officers of Election, which will be finalized at the subsequent meeting. The Voting Machine Security Plan and the ADA Checklist were reviewed and subsequently approved. Additionally, a motion was passed to formally appoint Lesley McCormick as the Voting Machine Custodian.
The upcoming meeting agenda includes calling the meeting to order, approval of the agenda, and approval of the December 10, 2025 minutes. New business will focus on discussing the progress of the Homeowner Helper Program and defining the goals for Threshold for the year 2026. The meeting will conclude with other business and adjournment. The preceding minutes detailed extensive discussion on advertising the Homeowner Helper Program through various channels like water bills, local media, and social media, and the Commission agreed on the importance of transparency regarding the loans. Additionally, the Commission approved a virtual attendance policy for its members.
The agenda for the meeting includes the Treasurer's Report detailing the Q2 Financials as of 12/31/2025. The City Manager's Report covers the Threshold Housing Commission MOU, a summary of Council's Goals Work Session, and an update on Housing Summit Working Groups. New Business focuses on the Bank of the James FSSP application, Round 2 FSSP mailing to Downtown Property Owners, and coordination with VDOT regarding the Spotswood property assignment, process, and budget allocation.
The Central Shenandoah Regional Housing Study, conducted by the Central Shenandoah Planning District Commission, analyzes housing challenges and opportunities across its subregions. It presents a roadmap of regional strategies, categorized as Strategic Priorities, Easy Wins, and Background Work, which include establishing a home improvement grants hub, pursuing a regional land bank, introducing a community land trust model, supporting permanent housing, and expanding housing counseling services. The study also provides tailored local strategies to address specific housing needs and aims to foster informed decision-making, sustainable housing solutions, and overall community well-being.
The Planning Commission agenda for the meeting included several key items. New business featured a request for a Certificate of Appropriateness for new signage for Rockbridge Tees at 150 Walker Street. Another agenda item involved the discussion and review of the 2025 Planning Commission Annual Report. The meeting also included the standard Call to Order, Approval of the Agenda, Citizens' Comments, and reports from City Council.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lexington Public Works Dept.'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Lexington Public Works Dept.'s meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database